May 2015 - Recurring Electrical Verification of Industry Complex

Installation Tester

Occupational Health and Safety Authorities require the recurring verification of electrical installations in industrial buildings. Hirsch Servo AG in Glanegg (Carinthia, Austria) had the electrical installation of all production-, storage- and office facilities verified by Zehndorfer Engineering. Since the available electrical plant documentation was incomplete, a new replacement plant document including single line diagrams was prepared.
 
The assessment was mainly done during running production, but also at night and in the week end when machines were shut-down and electric circuits switched off. Wire diameters, the physical state of the electrical installation, the dimensioning of the electrical safety- and switch-gear, loop impedance, earthing resistance, connection of protective conductor and isolation resistance were verified. The plant document for each of the buildings now comprises of up to date single line diagrams as well as all assessment reports. A good documentation later facilitates easy extension or reconstruction and saves time at the next verification.

 

Zehndorfer Engineering GmbH
Stift-Viktring-Str 21-6
9073 Klagenfurt

Tel:+43 (680) 244 3310

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.